Why we build with SolarEdge

Technology

Why we build with SolarEdge

Optimisers, panel-level visibility and SafeDC. The equipment behind the panels is what decides yield, maintenance and roof safety over twenty years.

Nobody regrets investing in solar too early

Market Insight

Nobody regrets investing in solar too early

Since 2022, businesses have relearned how volatile electricity prices can be. The ones who moved early are not the ones with regrets.

The next generation of solar, and why we are not recommending it yet

Technology

The next generation of solar, and why we are not recommending it yet

Perovskite-silicon tandem cells could be a step change in efficiency. Here is what still needs proving first.

Excellence starts where no one is looking

Our Approach

Excellence starts where no one is looking

Why we build the parts of a system nobody will ever see to the same standard as the parts they will.

A 300-panel install on an occupied Nottingham building

Case Study

A 300-panel install on an occupied Nottingham building

Routing cable down an occupied residential block meant bringing in abseil teams. A study in planning around people.

Commercial solar IRR: a framework for finance teams

Finance

Commercial solar IRR: a framework for finance teams

How commercial solar returns compare with property and fixed income, and the four inputs that actually move the number.

Panel count makes headlines. Geometry protects performance.

Engineering

Panel count makes headlines. Geometry protects performance.

Two systems of identical size can behave very differently over time. Capacity is easy to compare; design discipline is harder to see.

Why farms suit solar particularly well

Sector Focus

Why farms suit solar particularly well

Space, daytime demand and a clear understanding of how energy is used on site. Agricultural buildings tick most of the boxes.

Lamtek: 400 kW across two factory roofs

Case Study

Lamtek: 400 kW across two factory roofs

A large manufacturing installation with a 3.6-year payback, £1.2m in lifetime savings and a 30% internal rate of return.

Why grid capacity needs to be part of the conversation early

Project Delivery

Why grid capacity needs to be part of the conversation early

Connecting a commercial PV system needs network operator approval. Leave it late and it drives your programme.

Why commissioning is where reliability is earned

Project Delivery

Why commissioning is where reliability is earned

Commissioning looks like the final step. It is actually where long-term reliability is established.

What system monitoring actually tells you

Aftercare

What system monitoring actually tells you

Underperformance rarely announces itself. It drifts, a few percent at a time, until it becomes normal.

Low maintenance does not mean no maintenance

Aftercare

Low maintenance does not mean no maintenance

Solar PV needs relatively little ongoing attention. That is not the same as none, and the difference shows up in the return.

Why feasibility matters more than most people expect

Our Approach

Why feasibility matters more than most people expect

The most important part of a commercial solar project happens before any panels arrive on site.

A new year. The same way of doing solar.

Our Approach

A new year. The same way of doing solar.

Calm planning, clear communication, and systems designed to perform for decades rather than just on day one.

2025 in review: commercial energy decisions got more deliberate

Market Insight

2025 in review: commercial energy decisions got more deliberate

Organisations moved beyond asking whether solar works, and started asking how well it fits into long-term planning.

ESG reporting needs measured data, not estimates

Insight

ESG reporting needs measured data, not estimates

More organisations are producing ESG reports. Fewer can support every claim with clear, measured data.

Wheatcroft Business Park: the smartest part of the building was the bit nobody talked about

Case Study

Wheatcroft Business Park: the smartest part of the building was the bit nobody talked about

A multi-tenant business park that cut electricity spend by a third without a single disrupted working day.

Why the cheapest quote is usually the most expensive decision

Our Approach

Why the cheapest quote is usually the most expensive decision

In commercial solar, the lowest upfront cost per kW often turns out to be the most expensive choice over twenty-five years.

Holbrook: 320 panels on a site that already understands energy

Case Study

Holbrook: 320 panels on a site that already understands energy

A substantial SolarEdge array at Holbrook Power Station, with a four-year payback on a site built around generation.

Five factors that shape commercial solar payback

Insight

Five factors that shape commercial solar payback

Payback is never one neat number. It is shaped by five choices that work quietly together behind the scenes.

A heritage rooftop in the Lace Market, and why access is half the job

Case Study

A heritage rooftop in the Lace Market, and why access is half the job

Cartwright Communications wanted solar on a city-centre heritage roof with tight access. A 10 kW system that punches above its size.

Belmont Farm: solar and storage for a business that never switches off

Case Study

Belmont Farm: solar and storage for a business that never switches off

SolarEdge panels, optimisers and battery storage on a free-range egg farm in Cumbria, where demand runs 24 hours a day.

Endeavour House: when 98% of what you generate never leaves the building

Case Study

Endeavour House: when 98% of what you generate never leaves the building

A 364-panel system in County Durham using almost everything it produces on site, and tracking ahead of forecast.

Boston College: a small array that fits the building's day

Case Study

Boston College: a small array that fits the building's day

A 32 kWp rooftop system on the Mayflower building, sized around teaching hours rather than roof area.

Find out what solar would save your business.

Takes 60 seconds. An engineer will review your site and come back within 24 hours with an honest view. And if solar isn’t right for your building, we’ll tell you that too.

Get your free solar assessmentPrefer to talk? 0115 837 0910
Call 0115 837 0910Free assessment